What a CoC should include.
Supplier name, your PO and line numbers, part number and revision, quantity shipped, the specifications or drawing it conforms to, material and heat numbers where relevant, the date, and a signature from someone authorized to certify it.
CoC, MTR and first article.
The mill test report describes the raw metal. The first article inspection proves the first parts off a new setup match the drawing. The certificate of conformance covers each shipment. Together they give you a traceable record from the steel mill to your receiving dock.
At FoxFab.
Production program releases ship with a CoC, material certs and a packing list, and first articles are signed off against your print before production releases.
Questions.
Who signs a certificate of conformance?
Someone at the supplier authorized to certify quality, often a quality manager or owner.
How do I get a price?
Upload a STEP, SolidWorks or DXF file to FoxQuote at foxfablaser.com/instant-quote/ and choose the material and thickness. You get a price at every quantity in about 10 seconds, with no login.
So, what do you want to build?
Send a model, a drawing or a napkin sketch. We'll price the part, the program or the whole product.
